Loading...
Ormond Hotel Project 2017-10-13T14:45:49+00:00

Project Description

Ormond Hotel Project

Client requirements

The proposed development comprises of the construction of a new part five storey and part four storey hotel on the site of the existing hotel and to the rear of No’s 12 and 13 Ormond Quay Upper. The development includes a single storey basement to the front (south) of the site and setbacks at fifth storey level north and to the south. The new development comprises of 2 no. parallel east-west blocks separated by a landscaped courtyard space with lift lobbies connecting the two blocks from ground to fifth storey. The hotel will comprise of 121 no. bedrooms from ground to fourth floor.

Securing right outcomes

As PSDP, DCON Safety Consultants are reviewing particular site characteristics and challenges that include stabilisation and substructure works within an underground tunnel environment, maintaining a protected structure, identifying significant public interface considering the site’s location, proximity to occupied adjoining other properties and their rear site car park arrangements and notable temporary work requirements.

Project Details

DATE

2016 – 2018

CLIENT

Monteco Holdings Limited

PROJECT TYPE

Hotel